Helena Elementary School – Helena MO
The PWA conducted two separate projects to build Helena Elementary School. The first was for $9540, reported in the Moberly Monitor Index in 1938, and the second for the gymnasium/ auditorium $23,466 in 1939.
The PWA conducted two separate projects to build Helena Elementary School. The first was for $9540, reported in the Moberly Monitor Index in 1938, and the second for the gymnasium/ auditorium $23,466 in 1939.