Centre St. Reconstruction – Dover MA
The Federal Emergency Relief Administration (F.E.R.A.) conducted road improvement work in Dover, Mass., including the reconstruction of Centre Street to remove some dangerous turns.
The Federal Emergency Relief Administration (F.E.R.A.) conducted road improvement work in Dover, Mass., including the reconstruction of Centre Street to remove some dangerous turns.
The Federal Emergency Relief Administration (F.E.R.A.) painted the former Dover firehouse in 1934. The location and current status of the old building are unknown to Living New Deal.
The Works Progress Administration (W.P.A.) constructed a wall around Highland Cemetery from 1935-6.
The federal Civil Works Administration (C.W.A.) conducted “much needed repairs” to Dover Massachusetts’s town public library building in 1933. Next year the Federal Emergency Relief Administration (F.E.R.A.) regraded the library grounds.
The Federal Emergency Relief Administration (F.E.R.A.) conducted road improvement work in Dover, Mass., including the elimination of “several sharp curves on Powisett Street.”
The Federal Emergency Relief Administration (F.E.R.A.) conducted in-fill landscaping work at the then-school building in Dover, Mass. in 1934. The precise location is unknown to Living New Deal.
The federal Civil Works Administration (C.W.A.) conducted “much needed repairs” to Dover Massachusetts’s Town Hall in 1933. Next year the Federal Emergency Relief Administration (F.E.R.A.) regraded the town hall grounds, and also painted the building.
The Federal Emergency Relief Administration (F.E.R.A.) conducted road improvement work in Dover, Mass., including the reconstruction of a 500-foot stretch of Walpole Street. “[T]he raising of the grade of Walpole Street at the brook near the Zinsser Estate has greatly… read more